Bournes Hill Project

Spec:
Drainage was particularly important in this project due to the position of the property. Deep steps were required for easy access which became a feature of the driveway, whilst keeping a small flower bed for planting. Our customer wanted Tarmac with a double track block pattern to the edge and feature square pattern in the middle of the Tarmac.

Materials:
14 heavy duty black Plastic Acco Channels were laid and piped into existing storm drains to ensure ample drainage. The steps were constructed with Buff Riven Slabs. The driveway was edged with locally supplied Pink and Buff tegular 50mm Blocks and all finished with top quality SMA 6mm BS EN 13108-1 Tarmac.

Customer Comments:

To any potential customers, please do not hesitate to have Paul to do your job as they are hard working, trustworthy, reliable, whilst neat and tidy. What a great job him and his team have done to our drive – highly recommended

Mr & Mrs Chapman

Related Projects